We inspect steep slopes and bluffs across the Puget Sound and Strait for vegetation and drainage concerns.
A shoreline biologist report may be required when building near Shorelines of the State.
A wetland delineation and rating are required whenever building near a potential wetland.
Feasibility studies are performed while purchasing real estate to better understand the environmental risks on a property.
A net loss assessment (NNL) is a study often required during shoreline development to measure and mitigate impacts.
An ordinary high watermark of a Shoreline of the State or stream is commonly used as the stratification between aquatic and upland habitat.
A FEMA habitat assessment is required whenever planned development occurs within a FEMA Flood Zone.
We are certified by the WSDOT to conduct electrofishing and fish exclusion required for logging, culvert replacement, and other infrastructure.